Find out the average costs for common remodeling projects

Before we proceed to Pre-meeting, we would like to provide you with some information on remodeling average costs.

However, if you were looking to get an estimate on window, door, or floor replacements, you can skip to the bottom of the page to fill up the Pre-Meeting Worksheet.

Kitchen Remodel

$17-22K labor + $5-8K basic materials = $22-30K project total

  • Paint existing cabinets, install new hardware
  • New countertops and backsplash
  • New sink and faucet
  • NOTE: No changes to flooring, lighting, or appliances

$20-30K labor + $25-35K Mid-Level materials = $45-65K project total

  • No relocation of fixtures
  • New semi-custom cabinets
  • New granite or quartz countertops and backsplash
  • New flooring
  • New standard grade appliances (LG, Bosch, KitchenAid, Samsung)
  • New sink and faucet (Delta, Moen)
  • Minor electrical modifications as required load bearing walls
  • No window changes

$44-65K labor + $46-80K basic materials = $90-145K project total

  • Change in design/layout (i.e. knock down a non load-bearing wall and/or add an island, etc.)
  • New window if needed
  • New high-end semi-custom or full custom cabinets
  • New granite and quartz countertops and backsplash
  • New flooring including natural stone or high end hardwood
  • New high-end appliances (Viking, Wolf, Sub-zero)
  • New sink and faucet (Grohe, Kohler)
  • Relocate and add electrical, including pendant lights and under-cabinet lighting
  • NOTE: Removing and/or relocating load-bearing walls would add approximately $9-24K to the above total.

Bathroom Remodel

$9-12K labor + $2-3K basic materials = $11-15K project total

  • Toilet and vanity fixtures in same location
  • Floor tile, paint, update light bar and mirror

$14-20K labor + $3-4K basic materials = $17-24K project total

  • Relocate plumbing fixtures
  • Add pocket door ($2K)
  • Accent tile wall or room wainscoting ($2-3K)
  • Change drywall texture in whole room ($1-1.5K)
  • Add lighting

$15-25K labor + $4-7K materials = $19-32K project total

  • Plumbing fixtures in same location
  • Floor and shower tile, paint, update light bar and mirror
  • Frameless shower door

$27-38K labor + $7-10K materials = $36-48K project total

  • Change / add / remove window or interior walls
  • Relocate / add plumbing fixtures
  • Add pocket door ($2.5K)
  • Accent tile wall or room wainscoting ($3-5K)
  • Change drywall texture in whole room ($3-4K)
  • Add lighting
  • Frameless shower door

$29-34K labor + $7-15K materials = $36-49K project total

  • Plumbing fixtures in same location
  • Floor tile, paint, update light bar and mirror
  • Frameless shower door
  • Slight movement of plumbing fixtures

$54-85K labor + $12-25K materials = $66-110K project total

  • Change / add / remove window or interior walls
  • Relocate / add plumbing fixtures
  • Add pocket door ($2.5K)
  • Accent tile wall or room wainscoting ($4-6K)
  • Change drywall texture in whole room ($4-5K)
  • Add lighting
  • Frameless shower door
  • Flooring and/ or finishes in adjacent room

Whole Home Remodel

$60-$120 per square foot

  • Remodeled kitchen
  • Remodeled bathrooms throughout
  • New flooring throughout
  • All new interior doors
  • All new windows
  • Interior and exterior paint
  • Add recessed lighting
  • New base and trim
  • NOTE: Does not include roof, electrical re-wiring, plumbing re-piping, HVAC

These are only average estimates and may vary according to your specifications. If you are ready to move forward with your project, please click on the link below and fill out our Pre-Meeting Worksheet.